West End House, Stoke Poges.

A nice designed temporary roof scaffold. Erected to enable a second floor level to be created above the garages. The design was carried out by CHS design Ltd. The scaffold was shrink wrapped on the sides with a corrugated tin roof. Shrink wrapping these types of projects is not only aesthetically better but also the most cost effective way. The UpSafe team didn’t need to return to site to repair any side sheets throughout the whole project duration. We certainly had some high winds!! Customers, homeowners and the scaffolding team can certainly sleep better when this type of project is erected.